Wind farms
Le Quint (France)| Le Quint (France) |
|
| Operational (18 MW) |

| Country | France |
| County/Zone | 80 (Hauts-de-France) |
| City | Flers-sur-Noye - Fransures - Lawarde-Mauger-l’Hortoy |
| Wind farm type | Onshore wind farm |

![]() | 18 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owner |
![]() |
| Manufacturer |
|

| Operational | Gamesa G97/2000 (x 9) |

![]() | |

| Hub height | ![]() |
| Coordinates | Latitude 49° 42' 54.5" - Longitude 2° 15' 9.3" |
| Precise localization | Yes |
Databases ![]() France (32.0 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Moulin de la Somme (4 km) Oresmaux (5 km) Oresmaux 2 (6 km) Le Bois Ricart (7 km) Breteuil-Paillart (7 km) Breteuil-Esquennoy (8 km) La Chaussée Brunehaut (10 km) Bi-Herbin (10 km) Lavacquerie (11 km) La Belleuse (11 km) | ||
|
Insights Production capacity France : 26,372.0 MW (end of 2025) 80 (Hauts-de-France) : 2,334.6 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 18 November 2025 |
||