Wind farms
Wachtendonk (Germany)| Wachtendonk (Germany) |
|
| Operational (5,5 MW) |

| Country | Germany |
| County/Zone | Nordrhein-Westfalen |
| City | Wachtendonk |
| Wind farm type | Onshore wind farm |

![]() | 1.5 MW commissioned |
![]() | 1.5 MW commissioned |
![]() | 2.5 MW commissioned |

| Developers |
![]() #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturer |
|

| Operational | GE Vernova 1.5sl (x 2) |
| Operational | GE Vernova 2.5-120 (x 1) |

![]() | |

| City | Wachtendonk |
| Commissioning | ![]() |
| Turbine | 1x GE Vernova 1.5sl (power 1,500 kW, diameter 77 m) |
| Hub height | ![]() |
| Total nominal power | 1,500 kW |
| Status | Operational |
| Coordinates | Latitude 51° 23' 37.8" - Longitude 6° 22' 41.5" |
| Precise localization | No |
| City | Wachtendonk |
| Commissioning | ![]() |
| Turbine | 1x GE Vernova 1.5sl (power 1,500 kW, diameter 77 m) |
| Hub height | ![]() |
| Total nominal power | 1,500 kW |
| Status | Operational |
| Coordinates | Latitude 51° 23' 40.3" - Longitude 6° 22' 22.4" |
| Precise localization | No |
| City | Wachtendonk |
| Commissioning | ![]() |
| Turbine | 1x GE Vernova 2.5-120 (power 2,500 kW, diameter 120 m) |
| Hub height | ![]() |
| Total nominal power | 2,500 kW |
| Status | Operational |
| Developer | ![]() |
| Coordinates | Latitude 51° 24' 30.2" - Longitude 6° 18' 52.7" |
| Precise localization | Yes |
Databases ![]() Germany (104.2 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Niederrhein (2 km) Straelen II (2 km) Sanger Feld (2 km) Straelen 3 (3 km) Straelen (3 km) Gelinter (4 km) Herongen (7 km) Grefrath (7 km) Straelen Nord (8 km) Kerken-Eyll (8 km) | ||
|
Insights Production capacity Germany : 77,691.0 MW (end of 2025) Nordrhein-Westfalen : 9,671.3 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 9 March 2026 |
||