The Wind Power is a comprehensive database of detailed raw statistics on the rapidly growing sphere of wind energy and its supporting markets. The Wind Power is a comprehensive database of detailed raw statistics on the rapidly growing sphere of wind energy and its supporting markets.
English Français Deutsch Español 

Online access Wind farms Berge-Pirow (Germany)


Previous page
Sign up    Log in    Search


Berge-Pirow (Germany)
Operational (13,3 MW)


Localisation  

Country Germany
County/Zone Brandenburg
City Berge
Wind farm type Onshore wind farm

Key dates  

 3 MW commissioned
 3 MW commissioned
 4 MW commissioned
 3.3 MW commissioned

Players  

Developers
#ND
Operator #ND
Owner #ND
Manufacturers Enercon
Vestas

Turbines   

OperationalEnercon E101/3000 (x 2)
OperationalVestas V90/2000 (x 2)
OperationalVestas V112/3300 (x 1)

Sources  

No source available

Details  

Part #1



CityBerge
Commissioning
Turbine1x Enercon E101/3000 (power 3,000 kW, diameter 101 m)
Hub height
Total nominal power3,000 kW
StatusOperational
Developer
CoordinatesLatitude 53° 13' 15" - Longitude 11° 52' 32.6"
Precise localizationYes

Part #2



CityBerge
Commissioning
Turbine1x Enercon E101/3000 (power 3,000 kW, diameter 101 m)
Hub height
Total nominal power3,000 kW
StatusOperational
Developer
CoordinatesLatitude 53° 14' 7.1" - Longitude 11° 53' 8.9"
Precise localizationYes

Part #3



CityBerge
Commissioning
Turbines2x Vestas V90/2000 (power 2,000 kW, diameter 90 m)
Hub height
Total nominal power4,000 kW
StatusOperational
CoordinatesLatitude 53° 13' 51.5" - Longitude 11° 53' 1"
Precise localizationYes

Part #4



CityBerge
Commissioning
Turbine1x Vestas V112/3300 (power 3,300 kW, diameter 112 m)
Hub height
Total nominal power3,300 kW
StatusOperational
CoordinatesLatitude 53° 14' 12" - Longitude 11° 52' 59.9"
Precise localizationNo

Databases

     

Germany (104.2 GW)
Europe (654.1 GW)
World (2,450.5 GW)

All databases



PDF Summary




Nearby wind farms

Pirow-Berge (1 km)
Berge (1 km)
Berge-Kleeste (2 km)
Pirow II (2 km)
Pirow (2 km)
Brunow III (5 km)
Kribbe III (5 km)
Kribbe (6 km)
Brunow (9 km)
Triglitz (9 km)


Insights

Production capacity

Germany : 77,691.0 MW (end of 2025)
Brandenburg : 10,012.1 MW (*)


Légende

#ND : no data
(*) : according to The Wind Power database


Update for this sheet

2 June 2022




The Wind Power
All rights reserved - 2005-2026 - Cookie Policy
Conditions of Use and Sale
The Wind Power LinkedIn page   The Wind Power Twitter page