Generalities
|
|
Details
Part #1:
- City: Esterwegen
- Commissioning:

- 5 turbines: Enercon E66/1800 (power 1 800 kW, diameter 66 m)
- Hub height:

- Total nominal power: 9,000 kW
- Operational
- Onshore wind farm
- Developer: Enova
- Operator: Enova
- Owner:

- Source:

Part #2:
- City: Börger
- Commissioning:

- 4 turbines: Enercon E115/3000 (power 3 000 kW, diameter 115.7 m)
- Hub height:

- Total nominal power: 12,000 kW
- Operational
- Onshore wind farm
- Developer: Enova
- Operator: Enova
- Owner:

- Source:

Part #3:
- City: Börger
- Commissioning:

- 7 turbines: Enercon E115/3000 (power 3 000 kW, diameter 115.7 m)
- Hub height:

- Total nominal power: 21,000 kW
- Operational
- Onshore wind farm
- Developer: Enova
- Operator: Enova
- Owner:

- Source:

Part #4:
- City: Börger
- Commissioning:

- 1 turbine: (manufacturer name not available)
- Total nominal power: 5,560 kW
- Operational
- Onshore wind farm
Part #5:
- City: Börger
- Commissioning:

- 2 turbines: (manufacturer name not available)
- Total nominal power: 11,120 kW
- Operational
- Onshore wind farm
- Operator: Enova
Part #6:
- Part: Windtaler III
- City: Börger
- Commissioning:

- 2 turbines: Enercon E101/3000 (power 3 000 kW, diameter 101 m)
- Hub height:

- Total nominal power: 6,000 kW
- Operational
- Onshore wind farm
Localisation
Part #1:
Part #2:
Part #3:
Part #4:
- Latitude: 52° 55' 24.7"
- Longitude: 7° 28' 46.2"
- Geodetic system: WGS84
- Precise localization: no
Part #5:
- Latitude: 52° 55' 24.7"
- Longitude: 7° 28' 46.2"
- Geodetic system: WGS84
- Precise localization: no
Part #6:
Update for this sheet: 0
Complete/correct this sheet: