[Back to previous page]
	
		
			Generalities
						
		 | 
		
							 
				
					 | 
	
Details
Part #1: 
- City: Poppendorf
 - Commissioning: 

 - 2 turbines: Enercon E101/3050 (power 3 050 kW, diameter 101 m)
 - Hub height: 

 - Total nominal power: 6,100 kW
 - Operational
 - Onshore wind farm
 
Part #2: 
- City: Broderstorf
 - Commissioning: 

 - 2 turbines: e.n.o. energy 92 (power 2 200 kW, diameter 92.8 m)
 - Hub height: 

 - Total nominal power: 4,400 kW
 - Operational
 - Onshore wind farm
 
Part #3: 
- City: Bentwisch
 - Commissioning: 

 - 1 turbine: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
 - Hub height: 

 - Total nominal power: 2,300 kW
 - Operational
 - Onshore wind farm
 
Part #4: 
- City: Broderstorf
 - Commissioning: 

 - 1 turbine: Vestas V112/3075 (power 3 075 kW, diameter 112 m)
 - Hub height: 

 - Total nominal power: 3,075 kW
 - Operational
 - Onshore wind farm
 
Part #5: 
- Part: Neuendorf
 - City: Broderstorf
 - Commissioning: 

 - 1 turbine: Enercon E115/4200 (power 4 200 kW, diameter 115.7 m)
 - Hub height: 

 - Total nominal power: 4,200 kW
 - Operational
 - Onshore wind farm
 
Localisation
Part #1: 
- Latitude: 54° 6' 42.2"
 - Longitude: 12° 15' 19"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #2: 
Part #3: 
Part #4: 
Part #5: 
- Part: Neuendorf
 - Latitude: 54° 5' 58.9"
 - Longitude: 12° 13' 24.8"
 - Geodetic system: WGS84
 - Precise localization: no
 
Update for this sheet: 0  
Complete/correct this sheet: