Generalities
|
|
Details
Part #1:
- City: Wusterhusen
- Commissioning:

- 3 turbines: Nordtank NTK500/41 (power 500 kW, diameter 41 m)
- Hub height:

- Total nominal power: 1,500 kW
- Operational
- Onshore wind farm
Production forecast
- From Wednesday, March 22 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 56.3 %
- Expected production: 20,280 kWh
- Values from Weathernews Windcaster solution
Part #2:
- Part: Brünzow
- City: Wusterhusen
- Commissioning:

- 3 turbines: Neg Micon NM48/750 (power 750 kW, diameter 48.2 m)
- Hub height:

- Total nominal power: 2,250 kW
- Operational
- Onshore wind farm
Part #3:
- Part: Brünzow
- City: Wusterhusen
- Commissioning:

- 18 turbines: Neg Micon NM64c/1500 (power 1 500 kW, diameter 64 m)
- Hub height:

- Total nominal power: 27,000 kW
- Operational
- Onshore wind farm
Part #4:
- Part: Brünzow
- City: Wusterhusen
- Commissioning:

- 1 turbine: Neg Micon NM60/1000 (power 1 000 kW, diameter 60 m)
- Hub height:

- Total nominal power: 1,000 kW
- Operational
- Onshore wind farm
Localisation
Part #1:
- Latitude: 54° 6' 12.3"
- Longitude: 13° 36' 24.6"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Part: Brünzow
- Latitude: 54° 6' 5.2"
- Longitude: 13° 36' 40.9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Part: Brünzow
- Latitude: 54° 6' 5.2"
- Longitude: 13° 36' 40.9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #4:
- Part: Brünzow
- Latitude: 54° 6' 5.2"
- Longitude: 13° 36' 40.9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 24 June 2022
Complete/correct this sheet: