[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Emden
- Commissioning:

- 1 turbine: Enercon E40/500 (power 500 kW, diameter 40 m)
- Hub height:

- Total nominal power: 500 kW
- Operational
- Onshore wind farm
Production forecast
- From Sunday, September 24 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 28.4 %
- Expected production: 3,400 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Emden
- Commissioning:

- 2 turbines: Enercon E40/500 (power 500 kW, diameter 40 m)
- Hub height:

- Total nominal power: 1,000 kW
- Operational
- Onshore wind farm
Production forecast
- From Sunday, September 24 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 28.4 %
- Expected production: 6,810 kWh
- Values from Weathernews Windcaster solution
Part #3:
- City: Emden
- Commissioning:

- 2 turbines: Enercon E112/6000 (power 6 000 kW, diameter 114 m)
- Hub height:

- Total nominal power: 12,000 kW
- Operational
- Onshore wind farm
- Operator: Stadtwerke Emden
- Owner:

Production forecast
- From Sunday, September 24 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 22.8 %
- Expected production: 65,790 kWh
- Values from Weathernews Windcaster solution
Part #4:
- City: Emden
- Commissioning:

- 1 turbine: Enercon E112/4500 (power 4 500 kW, diameter 114 m)
- Hub height:

- Total nominal power: 4,500 kW
- Operational
- Onshore wind farm
- Operator: Stadtwerke Emden
- Owner:

Production forecast
- From Sunday, September 24 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 13.1 %
- Expected production: 14,130 kWh
- Values from Weathernews Windcaster solution
Part #5:
- City: Emden
- Commissioning:

- 1 turbine: Enercon E112/6000 (power 6 000 kW, diameter 114 m)
- Hub height:

- Total nominal power: 6,000 kW
- Operational
- Onshore wind farm
- Developer: Alterric
Production forecast
- From Sunday, September 24 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 20.5 %
- Expected production: 29,590 kWh
- Values from Weathernews Windcaster solution
Part #6:
- City: Emden
- Commissioning:

- 1 turbine: Enercon E112/6000 (power 6 000 kW, diameter 114 m)
- Hub height:

- Total nominal power: 6,000 kW
- Operational
- Onshore wind farm
- Operator: Stadtwerke Emden
- Owner:

Part #7:
- City: Emden
- Commissioning:

- 2 turbines: Tacke TW-500 (power 500 kW, diameter 37 m)
- Hub height:

- Total nominal power: 1,000 kW
- Operational
- Onshore wind farm
- Operator: Stadtwerke Emden
- Owner:

Localisation
Part #1:
- Latitude: 53° 22' 11.9"
- Longitude: 7° 12' 35.9"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 53° 22' 11.9"
- Longitude: 7° 12' 35.9"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Latitude: 53° 20' 24.3"
- Longitude: 7° 8' 59.8"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #4:
- Latitude: 53° 20' 24.3"
- Longitude: 7° 8' 59.8"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #5:
- Latitude: 53° 20' 12.5"
- Longitude: 7° 8' 31.7"
- Geodetic system: WGS84
- Precise localization: no
Part #6:
- Latitude: 53° 20' 12.9"
- Longitude: 7° 9' 13.9"
- Geodetic system: WGS84
- Precise localization: no
Part #7:
- Latitude: 53° 20' 17.1"
- Longitude: 7° 8' 57.1"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 6 September 2022
Complete/correct this sheet: