Part #1:
- City: Kirch Mulsow
- Commissioning:

- 1 turbine: Enercon E126/3500 (power 3 500 kW, diameter 126 m)
- Hub height:

- Total nominal power: 3,500 kW
- Operational
- Onshore wind farm
Production forecast
- From Monday, June 5 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 1 %
- Expected production: 810 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Carinerland
- Commissioning:

- 1 turbine: e.n.o. energy 92 (power 2 200 kW, diameter 92.8 m)
- Hub height:

- Total nominal power: 2,200 kW
- Operational
- Onshore wind farm
- Developer: e.n.o. Energy
- Operator: e.n.o. Energy
Production forecast
- From Monday, June 5 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 0.9 %
- Expected production: 460 kWh
- Values from Weathernews Windcaster solution
Part #3:
Production forecast
- From Monday, June 5 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 2.8 %
- Expected production: 1,360 kWh
- Values from Weathernews Windcaster solution
Part #4:
- City: Neubukow
- Commissioning:

- 1 turbine: Enercon E141/4200 (power 4 200 kW, diameter 141 m)
- Hub height:

- Total nominal power: 4,200 kW
- Operational
- Onshore wind farm
- Developer: Kloss New Energy
- Source:

Localisation
Part #1:
- Latitude: 53° 58' 47.5"
- Longitude: 11° 41' 40.5"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 53° 58' 33.5"
- Longitude: 11° 41' 47.4"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Latitude: 53° 58' 33.5"
- Longitude: 11° 41' 47.4"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #4:
- Latitude: 53° 58' 48.4"
- Longitude: 11° 42' 27.1"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 0