[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Diemelsee, Adorf
- Commissioning:

- 4 turbines: Dewind D6-1000 (power 1 000 kW, diameter 62 m)
- Hub height:

- Total nominal power: 4,000 kW
- Operational
- Onshore wind farm
- Developer: ABO-Wind
- Operator: ABO-Wind
- Source:

Production forecast
- From Monday, April 19 2021, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 1.3 %
- Expected production: 1,260 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Diemelsee, Adorf
- Commissioning:

- 2 turbines: Nordex N131/3300 (power 3 300 kW, diameter 131 m)
- Hub height:

- Total nominal power: 6,600 kW
- Operational
- Onshore wind farm
- Developer: ABO-Wind
- Operator: Energieallianz Bayern
- Owner:

- Source:

Localisation
Part #1:
- Latitude: 51° 21' 50.5"
- Longitude: 8° 50' 28.3"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 51° 21' 50.5"
- Longitude: 8° 50' 28.3"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 9 March 2021
Complete/correct this sheet: