[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Hagen
- Commissioning:

- 1 turbine: Enercon
- Total nominal power: 200 kW
- Operational
- Onshore wind farm
Production forecast
- From Monday, January 18 2021, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 33.7 %
- Expected production: 1,620 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Hagen
- 1 turbine: Enercon E126/3500 (power 3 500 kW, diameter 126 m)
- Total nominal power: 3,500 kW
- Operational
- Onshore wind farm
- Developer: Enercon
Localisation
Part #1:
- Latitude: 51° 17' 45.1"
- Longitude: 7° 34' 17.5"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 51° 17' 45.1"
- Longitude: 7° 34' 17.5"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 4 May 2020
Complete/correct this sheet: