Wind farms
Schlüsselburg (Germany)| Schlüsselburg (Germany) |
|
| Operational (12,8 MW) |

| Country | Germany |
| County/Zone | Niedersachsen |
| City | Petershagen |
| Wind farm type | Onshore wind farm |

![]() | 6.4 MW commissioned |
![]() | 6.4 MW commissioned |

| Developer |
![]() |
| Operator | #ND |
| Owner | #ND |
| Manufacturer |
|

| Operational | Enercon E115/3200 (x 4) |

![]() | |

| City | Petershagen |
| Commissioning | ![]() |
| Turbines | 2x Enercon E115/3200 (power 3,200 kW, diameter 115.7 m) |
| Hub height | ![]() |
| Total nominal power | 6,400 kW |
| Status | Operational |
| Developer | ![]() |
| Coordinates | Latitude 52° 28' 44.4" - Longitude 9° 2' 55.7" |
| Precise localization | No |
| City | Petershagen |
| Commissioning | ![]() |
| Turbines | 2x Enercon E115/3200 (power 3,200 kW, diameter 115.7 m) |
| Hub height | ![]() |
| Total nominal power | 6,400 kW |
| Status | Operational |
| Developer | ![]() |
| Coordinates | Latitude 52° 28' 44.4" - Longitude 9° 2' 55.7" |
| Precise localization | No |
Databases ![]() Germany (104.2 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Frestorf-Haustedt (4 km) Stolzenau (4 km) Auf dem Acker (4 km) Loccum (5 km) Wasserstrasse (6 km) Tipperberg (6 km) Steyerberg (9 km) Landesbergen Süd (9 km) Anemolter-Steyerberg (9 km) Mensinghausen I (9 km) | ||
|
Insights Production capacity Germany : 77,691.0 MW (end of 2025) Niedersachsen : 15,027.3 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 28 October 2023 |
||