[Back to previous page]
	
		
			Generalities
						
		 | 
		
							 
				
					 | 
	
Details
Part #1: 
- City: Behrendorf
 - Commissioning: 

 - 8 turbines: Nordex N54/1000 (power 1 000 kW, diameter 54 m)
 - Total nominal power: 8,000 kW
 - Dismantled
 - Onshore wind farm
 
Part #2: 
- City: Behrendorf
 - Commissioning: 

 - 7 turbines: Nordex N100/2500 (power 2 500 kW, diameter 100 m)
 - Hub height: 

 - Total nominal power: 17,500 kW
 - Operational
 - Onshore wind farm
 
Part #3: 
- City: Behrendorf
 - Commissioning: 

 - 1 turbine: Nordex N117/2400 (power 2 400 kW, diameter 117 m)
 - Hub height: 

 - Total nominal power: 2,400 kW
 - Operational
 - Onshore wind farm
 
Part #4: 
- City: Behrendorf
 - Commissioning: 

 - 6 turbines: Senvion 3.2M114 (power 3 200 kW, diameter 114 m)
 - Hub height: 

 - Total nominal power: 19,200 kW
 - Operational
 - Onshore wind farm
 
Part #5: 
- City: Behrendorf
 - Commissioning: 

 - 1 turbine: Nordex N100/3300 (power 3 300 kW, diameter 99.8 m)
 - Hub height: 

 - Total nominal power: 3,300 kW
 - Operational
 - Onshore wind farm
 
Part #6: 
- City: Behrendorf
 - Commissioning: 

 - 1 turbine: Nordex N100/3300 (power 3 300 kW, diameter 99.8 m)
 - Hub height: 

 - Total nominal power: 3,300 kW
 - Operational
 - Onshore wind farm
 
Localisation
Part #1: 
Part #2: 
Part #3: 
Part #4: 
- Latitude: 54° 34' 48.3"
 - Longitude: 9° 12' 38.4"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #5: 
Part #6: 
Update for this sheet: 0  
Complete/correct this sheet: