[Back to previous page]
	
		
			Generalities
						
		 | 
		
							 
				
					 | 
	
Details
Part #1: 
- City: Lebus
 - Commissioning: 

 - 3 turbines: Enercon E66/1800 (power 1 800 kW, diameter 66 m)
 - Hub height: 

 - Total nominal power: 5,400 kW
 - Dismantled
 - Onshore wind farm
 
Part #2: 
- City: Lebus
 - Commissioning: 

 - 2 turbines: Enercon E126/4200 (power 4 200 kW, diameter 127 m)
 - Hub height: 

 - Total nominal power: 8,400 kW
 - Operational
 - Onshore wind farm
 
Part #3: 
- Part: Lebus
 - City: Mallnow
 - Commissioning: 

 - 1 turbine: Enercon E82/2000 (power 2 000 kW, diameter 82 m)
 - Hub height: 

 - Total nominal power: 2,000 kW
 - Operational
 - Onshore wind farm
 
Part #4: 
- Part: Lebus
 - City: Mallnow
 - Commissioning: 

 - 3 turbines: Enercon E126/4200 (power 4 200 kW, diameter 127 m)
 - Hub height: 

 - Total nominal power: 12,600 kW
 - Operational
 - Onshore wind farm
 
Part #5: 
- Part: Lebus
 - City: Märkisch-Oderland
 - Commissioning: 

 - 1 turbine: Vestas V162/6.0MW (power 6 000 kW, diameter 162 m)
 - Hub height: 

 - Total nominal power: 6,000 kW
 - Operational
 - Onshore wind farm
 
Localisation
Part #1: 
Part #2: 
Part #3: 
Part #4: 
Part #5: 
- Part: Lebus
 - Latitude: 52° 26' 32.3"
 - Longitude: 14° 29' 34.7"
 - Geodetic system: WGS84
 - Precise localization: no
 
Update for this sheet: 0  
Complete/correct this sheet: