[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Hagen
- Commissioning:

- 1 turbine: Enercon E44/600 (power 600 kW, diameter 44 m)
- Hub height:

- Total nominal power: 600 kW
- Operational
- Onshore wind farm
Production forecast
- From Sunday, August 14 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 1.8 %
- Expected production: 260 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Hagen
- Commissioning:

- 1 turbine: Enercon E66/1800 (power 1 800 kW, diameter 66 m)
- Hub height:

- Total nominal power: 1,800 kW
- Operational
- Onshore wind farm
- Developer: SL Windenergie
- Operator: SL Windenergie
- Owner:

- Source:

Production forecast
- From Sunday, August 14 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 2.1 %
- Expected production: 920 kWh
- Values from Weathernews Windcaster solution
Part #3:
- City: Hagen
- Commissioning:

- 1 turbine: Enercon E66/1800 (power 1 800 kW, diameter 66 m)
- Hub height:

- Total nominal power: 1,800 kW
- Operational
- Onshore wind farm
- Developer: SL Windenergie
- Operator: SL Windenergie
- Owner:

- Source:

Localisation
Part #1:
- Latitude: 51° 21' 44.3"
- Longitude: 7° 27' 47.4"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 51° 19' 13.9"
- Longitude: 7° 33' 20.9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Latitude: 51° 19' 13.9"
- Longitude: 7° 33' 20.9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 5 August 2022
Complete/correct this sheet: