[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Stüdenitz-Schönermark
- Commissioning:

- 23 turbines: Vestas V82/1500 (power 1 500 kW, diameter 82 m)
- Hub height:

- Total nominal power: 34,500 kW
- Operational
- Onshore wind farm
- Developer: Global Wind Power
- Operator: Global Wind Power
- Owner:

- Source:

Production forecast
- From Saturday, January 23 2021, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 1.4 %
- Expected production: 11,230 kWh
- Values from Weathernews Windcaster solution
Part #2:
Production forecast
- From Saturday, January 23 2021, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 1.4 %
- Expected production: 490 kWh
- Values from Weathernews Windcaster solution
Part #3:
- City: Breddin
- Commissioning:

- 2 turbines: Vestas V90/2000 (power 2 000 kW, diameter 90 m)
- Hub height:

- Total nominal power: 4,000 kW
- Operational
- Onshore wind farm
Production forecast
- From Saturday, January 23 2021, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 1.4 %
- Expected production: 1,300 kWh
- Values from Weathernews Windcaster solution
Part #4:
- City: Breddin
- Commissioning:

- 1 turbine: Vestas V90/2000 (power 2 000 kW, diameter 90 m)
- Hub height:

- Total nominal power: 2,000 kW
- Operational
- Onshore wind farm
Localisation
Part #1:
- Latitude: 52° 53' 55"
- Longitude: 12° 15' 55.2"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 52° 53' 24"
- Longitude: 12° 16' 47.9"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Latitude: 52° 53' 32.3"
- Longitude: 12° 14' 28.7"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #4:
- Latitude: 52° 53' 36.4"
- Longitude: 12° 14' 52.1"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 11 February 2019
Complete/correct this sheet: