Production forecast
- From Thursday, March 23 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 55.4 %
- Expected production: 53,160 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Langeneichstädt
- Commissioning:

- 2 turbines: Enercon E40/500 (power 500 kW, diameter 40 m)
- Hub height:

- Total nominal power: 1,000 kW
- Operational
- Onshore wind farm
Production forecast
- From Thursday, March 23 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 90.4 %
- Expected production: 21,700 kWh
- Values from Weathernews Windcaster solution
Part #3:
- City: Langeneichstädt
- Commissioning:

- 2 turbines: Enercon E44/600 (power 600 kW, diameter 44 m)
- Hub height:

- Total nominal power: 1,200 kW
- Operational
- Onshore wind farm
Production forecast
- From Thursday, March 23 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 93.6 %
- Expected production: 26,940 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 51° 19' 47.9"
- Longitude: 11° 44' 24"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 51° 19' 47.9"
- Longitude: 11° 44' 24"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Latitude: 51° 19' 47.9"
- Longitude: 11° 44' 24"
- Geodetic system: WGS84
- Precise localization: no