Wind farms
Nickelsdorf Erweiterung (Austria)| Nickelsdorf Erweiterung (Austria) |
|
| Operational (7,05 MW) |

| Country | Austria |
| County/Zone | Burgenland |
| City | Nickelsdorf |
| Wind farm type | Onshore wind farm |

![]() | 2.35 MW commissioned |
![]() | 4.7 MW commissioned |

| Developer |
![]() |
| Operator | #ND |
| Owner | #ND |
| Manufacturer |
|

| Operational | Enercon E103/2350 (x 2) |
| Operational | Enercon E92/2350 (x 1) |

![]() | |

| Part | Teil 1 |
| City | Nickelsdorf |
| Turbine | 1x Enercon E92/2350 (power 2,350 kW, diameter 92 m) |
| Total nominal power | 2,350 kW |
| Status | Operational |
| Developer | ![]() |
| Coordinates | Latitude 47° 55' 20.6" - Longitude 17° 1' 8.4" |
| Precise localization | Yes |
| Part | Teil 2 |
| City | Nickelsdorf |
| Turbines | 2x Enercon E103/2350 (power 2,350 kW, diameter 103 m) |
| Total nominal power | 4,700 kW |
| Status | Operational |
| Developer | ![]() |
| Coordinates | Latitude 47° 54' 14.1" - Longitude 17° 3' 50.6" |
| Precise localization | Yes |
Databases ![]() Austria (4.4 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Nickelsdorf (AT) (1 km) Halbturn Nord (3 km) Mönchhof Ost (4 km) Mönchhof Erweiterung (4 km) Heidäcker Mönchhof (5 km) Edmundshof (5 km) Zurndorf (7 km) Mönchhof Dreijoch (7 km) Mönchhof Nord (7 km) Halbturn Puszta (7 km) | ||
|
Insights Production capacity Austria : 4,221.0 MW (end of 2025) Burgenland : 1,682.7 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 28 May 2026 |
||