[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Berglicht
- Commissioning:

- 9 turbines: Südwind S77/1500 (power 1 500 kW, diameter 77 m)
- Hub height:

- Total nominal power: 13,500 kW
- Operational
- Onshore wind farm
- Developer: ABO-Wind
- Operator: ABO-Wind
- Source:

Production forecast
- From Thursday, April 22 2021, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 7.3 %
- Expected production: 23,580 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Schönberg
- Commissioning:

- 4 turbines: Vestas V112/3300 (power 3 300 kW, diameter 112 m)
- Hub height:

- Total nominal power: 13,200 kW
- Operational
- Onshore wind farm
- Developer: ABO-Wind
Part #3:
- Part: Talling
- City: Talling
- Commissioning:

- 2 turbines: Nordex N90/2300 (power 2 300 kW, diameter 90 m)
- Hub height:

- Total nominal power: 4,600 kW
- Operational
- Onshore wind farm
- Developer: ABO-Wind
- Operator: ABO-Wind
- Source:

Production forecast
- From Thursday, April 22 2021, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 9.7 %
- Expected production: 10,670 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 49° 46' 41.7"
- Longitude: 6° 56' 34.8"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 49° 46' 59.1"
- Longitude: 6° 55' 50.5"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Part: Talling
- Latitude: 49° 46' 9.4"
- Longitude: 6° 57' 12.8"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 7 January 2019
Complete/correct this sheet: