Wind farms
Geestland (Germany)| Geestland (Germany) |
|
| Operational (75,3 MW) |

| Country | Germany |
| County/Zone | Niedersachsen |
| City | Geestland |
| Wind farm type | Onshore wind farm |

![]() | 11 MW commissioned |
![]() | 46 MW commissioned |
![]() | 18.3 MW commissioned |

| Developer | #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturers |
|

| Operational | Enercon E82/2300 (x 20) |
| Operational | Bonus B54/1000 (x 11) |
| Operational | Enercon E101/3050 (x 6) |

| No source available |

| City | Geestland |
| Commissioning | ![]() |
| Turbines | 20x Enercon E82/2300 (power 2,300 kW, diameter 82 m) |
| Hub height | ![]() |
| Total nominal power | 46,000 kW |
| Status | Operational |
| Coordinates | Latitude 53° 41' 6.8" - Longitude 8° 38' 46.7" |
| Precise localization | No |
| City | Geestland |
| Commissioning | ![]() |
| Turbines | 6x Enercon E101/3050 (power 3,050 kW, diameter 101 m) |
| Hub height | ![]() |
| Total nominal power | 18,300 kW |
| Status | Operational |
| Coordinates | Latitude 53° 39' 27.5" - Longitude 8° 45' 38.3" |
| Precise localization | No |
| City | Geestland |
| Commissioning | ![]() |
| Turbines | 11x Bonus B54/1000 (power 1,000 kW, diameter 54.1 m) |
| Hub height | ![]() |
| Total nominal power | 11,000 kW |
| Status | Operational |
| Coordinates | Latitude 53° 38' 9.4" - Longitude 8° 38' 11.8" |
| Precise localization | No |
Databases ![]() Germany (104.2 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Sievern (1 km) Debstedt (2 km) Wurster Nordseeküste (4 km) Neuenwalde (5 km) Wremen (5 km) Sachsendingen (5 km) Langen-Neuenwalde (5 km) Dorum II (5 km) Dorum (5 km) Speckenbüttel (7 km) | ||
|
Insights Production capacity Germany : 77,691.0 MW (end of 2025) Niedersachsen : 15,027.3 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 29 August 2022 |
||