Altenmedingen (Germany)| Altenmedingen (Germany) |
|
| Operational (23,3 MW) |

| Country | Germany |
| County/Zone | Niedersachsen |
| City | Altenmedingen |
| Wind farm type | Onshore wind farm |

![]() | 18 MW commissioned |
![]() | 5.3 MW commissioned |

| Developer | #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturer |
|

| Operational | GE Vernova 3.6-137 (x 5) |
| Operational | GE Vernova 5.3-158 (x 1) |

| No source available |

| Part | Aljarn-Eddelstorf |
| City | Altenmedingen |
| Commissioning | ![]() |
| Turbines | 5x GE Vernova 3.6-137 (power 3,600 kW, diameter 137 m) |
| Hub height | ![]() |
| Total nominal power | 18,000 kW |
| Status | Operational |
| Coordinates | Latitude 53° 9' 15.4" - Longitude 10° 38' 6.3" |
| Precise localization | No |
| Part | Bostelwiebeck |
| City | Altenmedingen |
| Commissioning | ![]() |
| Turbine | 1x GE Vernova 5.3-158 (power 5,300 kW, diameter 158 m) |
| Hub height | ![]() |
| Total nominal power | 5,300 kW |
| Status | Operational |
| Coordinates | Latitude 53° 9' 15.4" - Longitude 10° 38' 6.3" |
| Precise localization | No |
Databases ![]() Germany (104.2 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Bostelwiebeck II (1 km) Bow (2 km) Haaßel (3 km) Bad Bevensen (6 km) Bad Bevensen-Drögennottorf (7 km) Boitze (8 km) Vastorf (9 km) Thomasburg (10 km) Dahlem (Niedersachsen) (10 km) Mücklingen (10 km) | ||
|
Insights Production capacity Germany : 77,691.0 MW (end of 2025) Niedersachsen : 15,027.3 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 30 October 2023 |
||