Wind farms
Bruchhagen (Germany)| Bruchhagen (Germany) |
|
| Operational (56 MW) |

| Country | Germany |
| County/Zone | Niedersachsen |
| City | Steyerberg - Stolzenau |
| Wind farm type | Onshore wind farm |

![]() | 36 MW commissioned |
![]() | 20 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owner |
![]() |
| Manufacturer |
|

| Operational | Enercon E126/4000 (x 14) |

![]() | |

| City | Stolzenau |
| Commissioning | ![]() |
| Turbines | 9x Enercon E126/4000 (power 4,000 kW, diameter 127 m) |
| Hub height | ![]() |
| Total nominal power | 36,000 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 52° 32' 2.1" - Longitude 8° 56' 35.6" |
| Precise localization | No |
| City | Steyerberg |
| Commissioning | ![]() |
| Turbines | 5x Enercon E126/4000 (power 4,000 kW, diameter 127 m) |
| Hub height | ![]() |
| Total nominal power | 20,000 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 52° 32' 2.1" - Longitude 8° 56' 35.6" |
| Precise localization | No |
Databases ![]() Germany (104.2 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Mensinghausen I (0 km) Mensinghausen II (0 km) Mensinghausen III (0 km) Uchte (4 km) Stolzenau (6 km) Frestorf-Haustedt (6 km) Auf dem Acker (6 km) Lohhof (7 km) Anemolter-Steyerberg (8 km) Höfen (Niedersachsen) (8 km) | ||
|
Insights Production capacity Germany : 77,691.0 MW (end of 2025) Niedersachsen : 15,027.3 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 16 December 2024 |
||