[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Hückelhoven
- Commissioning:

- 1 turbine: Nordex N117/2400 (power 2 400 kW, diameter 117 m)
- Hub height:

- Total nominal power: 2,400 kW
- Operational
- Onshore wind farm
- Developer: BMR
- Source:

Part #2:
- City: Hückelhoven
- Commissioning:

- 1 turbine: Vestas V136/3450 (power 3 450 kW, diameter 136 m)
- Hub height:

- Total nominal power: 3,600 kW (uprated turbine)
- Operational
- Onshore wind farm
Part #3:
- Part: Linnich
- City: Hückelhoven
- Commissioning:

- 2 turbines: Bonus B62/1300 (power 1 300 kW, diameter 62 m)
- Hub height:

- Total nominal power: 2,600 kW
- Operational
- Onshore wind farm
Production forecast
- From Sunday, September 24 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 5.6 %
- Expected production: 3,500 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 51° 3' 8.8"
- Longitude: 6° 13' 25.1"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 51° 3' 49.3"
- Longitude: 6° 14' 52.2"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Part: Linnich
- Latitude: 51° 3' 8.8"
- Longitude: 6° 13' 25.1"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 25 August 2022
Complete/correct this sheet: