Part #1: 
- City: Soest
 - Commissioning: 

 - 1 turbine: Enercon E40/600 (power 600 kW, diameter 40 m)
 - Hub height: 

 - Total nominal power: 600 kW
 - Operational
 - Onshore wind farm
 - Developer: RWE
 - Operator: RWE
 - Owner: 

 
Part #2: 
- City: Soest
 - Commissioning: 

 - 1 turbine: Enercon E66/1800 (power 1 800 kW, diameter 66 m)
 - Hub height: 

 - Total nominal power: 1,800 kW
 - Operational
 - Onshore wind farm
 - Developer: RWE
 - Operator: RWE
 - Owner: 

 
Part #3: 
- City: Welver
 - Commissioning: 

 - 1 turbine: Enercon E44/600 (power 600 kW, diameter 44 m)
 - Hub height: 

 - Total nominal power: 600 kW
 - Operational
 - Onshore wind farm
 - Developer: RWE
 - Operator: RWE
 - Owner: 

 
Part #4: 
- City: Welver
 - Commissioning: 

 - 2 turbines: Enercon E40/600 (power 600 kW, diameter 40 m)
 - Hub height: 

 - Total nominal power: 1,200 kW
 - Operational
 - Onshore wind farm
 - Developer: RWE
 - Operator: RWE
 - Owner: 

 
Part #5: 
- City: Welver
 - Commissioning: 

 - 1 turbine: Enercon E40/600 (power 600 kW, diameter 40 m)
 - Hub height: 

 - Total nominal power: 600 kW
 - Operational
 - Onshore wind farm
 - Developer: RWE
 - Operator: RWE
 - Owner: 

 
Part #6: 
- City: Welver
 - Commissioning: 

 - 1 turbine: Enercon E40/600 (power 600 kW, diameter 40 m)
 - Hub height: 

 - Total nominal power: 600 kW
 - Operational
 - Onshore wind farm
 - Developer: RWE
 - Operator: RWE
 - Owner: 

 
Part #7: 
- City: Welver
 - Commissioning: 

 - 1 turbine: Enercon E66/1800 (power 1 800 kW, diameter 66 m)
 - Hub height: 

 - Total nominal power: 1,800 kW
 - Operational
 - Onshore wind farm
 - Developer: RWE
 - Operator: RWE
 - Owner: 

 
Part #8: 
- City: Welver
 - Commissioning: 

 - 1 turbine: Enercon E40/600 (power 600 kW, diameter 40 m)
 - Total nominal power: 600 kW
 - Operational
 - Onshore wind farm
 
Part #9: 
- City: Welver
 - Commissioning: 

 - 1 turbine: Dewind D4 (power 600 kW, diameter 48 m)
 - Hub height: 

 - Total nominal power: 600 kW
 - Operational
 - Onshore wind farm
 
Localisation
Part #1: 
- Latitude: 51° 34' 1.8"
 - Longitude: 7° 59' 37.1"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #2: 
- Latitude: 51° 34' 25.3"
 - Longitude: 8° 1' 4.7"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #3: 
- Latitude: 51° 34' 28.3"
 - Longitude: 7° 59' 22.4"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #4: 
- Latitude: 51° 34' 25.4"
 - Longitude: 7° 59' 29.8"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #5: 
- Latitude: 51° 33' 57.4"
 - Longitude: 7° 59' 35.4"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #6: 
- Latitude: 51° 33' 56.3"
 - Longitude: 7° 59' 53"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #7: 
- Latitude: 51° 34' 36.8"
 - Longitude: 7° 59' 29.2"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #8: 
- Latitude: 51° 34' 11.8"
 - Longitude: 7° 59' 33.4"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #9: 
- Latitude: 51° 37' 0.2"
 - Longitude: 7° 57' 18"
 - Geodetic system: WGS84
 - Precise localization: no
 
Update for this sheet: 0  