[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Hermannsburg
- Commissioning:

- 6 turbines: Vestas V90/2000 (power 2 000 kW, diameter 90 m)
- Total nominal power: 12,000 kW
- Operational
- Onshore wind farm
- Developers: WPD/e3 GmbH
- Operator: e3 GmbH
- Owner:

- Source:

- Source:

- Source:

Production forecast
- From Thursday, January 21 2021, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 89.3 %
- Expected production: 257,060 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Hermannsburg
- Commissioning:

- 1 turbine: Repower MD77 (power 1 500 kW, diameter 77 m)
- Hub height:

- Total nominal power: 1,500 kW
- Operational
- Onshore wind farm
- Developer: e3 GmbH
- Operator: e3 GmbH
- Owner:

- Source:

Production forecast
- From Thursday, January 21 2021, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 87 %
- Expected production: 31,310 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 52° 52' 42"
- Longitude: 10° 2' 14.5"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 52° 51' 15.9"
- Longitude: 10° 3' 20"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 3 April 2020
Complete/correct this sheet: