[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Altenbeken
- Commissioning:

- 1 turbine: Dewind D4 (power 600 kW, diameter 48 m)
- Hub height:

- Total nominal power: 600 kW
- Operational
- Onshore wind farm
Part #2:
- Part: Buke
- City: Altenbeken
- Commissioning:

- 1 turbine: Enercon E147/4300 (power 4 300 kW, diameter 147 m)
- Hub height:

- Total nominal power: 4,300 kW
- Operational
- Onshore wind farm
Localisation
Part #1:
- Latitude: 51° 26' 33.9"
- Longitude: 8° 33' 8.7"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Part: Buke
- Latitude: 51° 43' 49.7"
- Longitude: 8° 54' 54"
- Geodetic system: WGS84
- Precise localization: no
Pictures

Author: Gabriel - License: All right reserved
Picture reference: 17538 - Date: 2025

Author: Gabriel - License: All right reserved
Picture reference: 17539 - Date: 2025

Author: Gabriel - License: All right reserved
Picture reference: 17540 - Date: 2025

Author: Gabriel - License: All right reserved
Picture reference: 17541 - Date: 2025

Author: Gabriel - License: All right reserved
Picture reference: 17542 - Date: 2025

Author: Gabriel - License: All right reserved
Picture reference: 17543 - Date: 2025

Author: Gabriel - License: All right reserved
Picture reference: 17544 - Date: 2025

Author: Gabriel - License: All right reserved
Picture reference: 17545 - Date: 2025
Update for this sheet: 27 October 2023