[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Sankt Wendel
- Commissioning:

- 4 turbines: Vestas V82/1500 (power 1 500 kW, diameter 82 m)
- Hub height:

- Total nominal power: 6,000 kW
- Operational
- Onshore wind farm
- Developers: WPD/Sowitec
- Source:

- Source:

Production forecast
- From Saturday, January 23 2021, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 1.9 %
- Expected production: 2,690 kWh
- Values from Weathernews Windcaster solution
Part #2:
- Part: Schleifstein I
- City: Sankt Wendel
- Commissioning:

- 2 turbines: Vestas V90/2000 (power 2 000 kW, diameter 90 m)
- Hub height:

- Total nominal power: 4,000 kW
- Operational
- Onshore wind farm
- Developer: WPD
- Operator: WPD
- Source:

Part #3:
- Part: Schleifstein II
- City: Sankt Wendel
- Commissioning:

- 1 turbine: Vestas V90/2000 (power 2 000 kW, diameter 90 m)
- Hub height:

- Total nominal power: 2,000 kW
- Operational
- Onshore wind farm
- Developer: WPD
- Operator: WPD
- Source:

Localisation
Part #1:
- Latitude: 49° 28' 36.4"
- Longitude: 7° 14' 5.1"
- Altitude: 430 m
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Part: Schleifstein I
- Latitude: 49° 28' 35.7"
- Longitude: 7° 13' 33.5"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Part: Schleifstein II
- Latitude: 49° 28' 35.7"
- Longitude: 7° 13' 33.5"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 14 January 2021
Complete/correct this sheet: