[Back to previous page]
	
		
			Generalities
						
		 | 
		
							 
				
					 | 
	
Details
Part #1: 
- City: Altenbeken
 - Commissioning: 

 - 1 turbine: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
 - Hub height: 

 - Total nominal power: 2,300 kW
 - Operational
 - Onshore wind farm
 
Part #2: 
- City: Altenbeken
 - Commissioning: 

 - 1 turbine: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
 - Hub height: 

 - Total nominal power: 2,300 kW
 - Operational
 - Onshore wind farm
 
Part #3: 
- City: Altenbeken
 - Commissioning: 

 - 4 turbines: Nordex N27/150 (power 150 kW, diameter 27 m)
 - Hub height: 

 - Total nominal power: 600 kW
 - Operational
 - Onshore wind farm
 
Part #4: 
- City: Altenbeken
 - Commissioning: 

 - 1 turbine: Enercon E40/500 (power 500 kW, diameter 40 m)
 - Total nominal power: 500 kW
 - Operational
 - Onshore wind farm
 
Part #5: 
- City: Altenbeken
 - Commissioning: 

 - 1 turbine: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
 - Hub height: 

 - Total nominal power: 2,300 kW
 - Operational
 - Onshore wind farm
 
Part #6: 
- City: Altenbeken
 - Commissioning: 

 - 1 turbine: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
 - Hub height: 

 - Total nominal power: 2,300 kW
 - Operational
 - Onshore wind farm
 - Operator: Brockmann Wind GmbH
 
Part #7: 
- City: Altenbeken
 - Commissioning: 

 - 1 turbine: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
 - Hub height: 

 - Total nominal power: 2,300 kW
 - Operational
 - Onshore wind farm
 - Operator: Brockmann Wind GmbH
 
Part #8: 
- City: Altenbeken
 - Commissioning: 

 - 1 turbine: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
 - Hub height: 

 - Total nominal power: 2,300 kW
 - Operational
 - Onshore wind farm
 
Part #9: 
- City: Altenbeken
 - Commissioning: 

 - 1 turbine: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
 - Hub height: 

 - Total nominal power: 2,300 kW
 - Operational
 - Onshore wind farm
 
Part #10: 
- City: Altenbeken
 - Commissioning: 

 - 1 turbine: Enercon E40/500 (power 500 kW, diameter 40 m)
 - Hub height: 

 - Total nominal power: 500 kW
 - Operational
 - Onshore wind farm
 
Part #11: 
- City: Altenbeken
 - Commissioning: 

 - 1 turbine: Enercon E40/500 (power 500 kW, diameter 40 m)
 - Hub height: 

 - Total nominal power: 500 kW
 - Operational
 - Onshore wind farm
 
Part #12: 
- Part: Schwaney
 - City: Altenbeken
 - Commissioning: 

 - 1 turbine: Enercon E138/4200 (power 4 200 kW, diameter 138.25 m)
 - Hub height: 

 - Total nominal power: 4,200 kW
 - Operational
 - Onshore wind farm
 
Part #13: 
- Part: Schwaney
 - City: Altenbeken
 - Commissioning: 

 - 1 turbine: Enercon E138/4200 (power 4 200 kW, diameter 138.25 m)
 - Hub height: 

 - Total nominal power: 4,200 kW
 - Operational
 - Onshore wind farm
 
Localisation
Part #1: 
- Latitude: 51° 46' 19.2"
 - Longitude: 8° 55' 55.5"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #2: 
- Latitude: 51° 45' 10.4"
 - Longitude: 8° 55' 59.9"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #3: 
Part #4: 
- Latitude: 51° 26' 31.2"
 - Longitude: 8° 33' 7.9"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #5: 
- Latitude: 51° 43' 14.7"
 - Longitude: 8° 52' 36.6"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #6: 
- Latitude: 51° 43' 15.5"
 - Longitude: 8° 53' 51.8"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #7: 
- Latitude: 51° 44' 26.4"
 - Longitude: 8° 55' 35.5"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #8: 
- Latitude: 51° 44' 18.9"
 - Longitude: 8° 55' 42.5"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #9: 
- Latitude: 51° 0' 0"
 - Longitude: 8° 33' 0"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #10: 
- Latitude: 51° 43' 32.8"
 - Longitude: 8° 53' 36"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #11: 
- Latitude: 51° 43' 34.2"
 - Longitude: 8° 53' 25.2"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #12: 
Part #13: 
- Part: Schwaney
 - Latitude: 51° 43' 39.9"
 - Longitude: 8° 54' 34.5"
 - Geodetic system: WGS84
 - Precise localization: no
 
Update for this sheet: 0  
Complete/correct this sheet: