Part #1: 
- City: Teuchern
 - Commissioning: 

 - 1 turbine: Enercon E115/3000 (power 3 000 kW, diameter 115.7 m)
 - Hub height: 

 - Total nominal power: 3,000 kW
 - Operational
 - Onshore wind farm
 
Part #2: 
- City: Meineweh
 - Commissioning: 

 - 11 turbines: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
 - Hub height: 

 - Total nominal power: 25,300 kW
 - Operational
 - Onshore wind farm
 
Part #3: 
- City: Stößen
 - Commissioning: 

 - 1 turbine: Enercon E70/2300 (power 2 300 kW, diameter 71 m)
 - Hub height: 

 - Total nominal power: 2,300 kW
 - Operational
 - Onshore wind farm
 
Part #4: 
- City: Teuchern
 - Commissioning: 

 - 4 turbines: Vestas V112/3075 (power 3 075 kW, diameter 112 m)
 - Hub height: 

 - Total nominal power: 12,300 kW
 - Operational
 - Onshore wind farm
 
Part #5: 
- City: Teuchern
 - Commissioning: 

 - 1 turbine: Enercon E101/3050 (power 3 050 kW, diameter 101 m)
 - Hub height: 

 - Total nominal power: 3,050 kW
 - Operational
 - Onshore wind farm
 - Owner: 

 - Source: 

 
Part #6: 
- City: Teuchern
 - Commissioning: 

 - 5 turbines: Enercon E101/3050 (power 3 050 kW, diameter 101 m)
 - Hub height: 

 - Total nominal power: 15,250 kW
 - Operational
 - Onshore wind farm
 - Owner: 

 - Source: 

 
Localisation
Part #1: 
Part #2: 
- Latitude: 51° 8' 26.4"
 - Longitude: 11° 58' 7.7"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #3: 
- Latitude: 51° 8' 26.4"
 - Longitude: 11° 58' 7.7"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #4: 
- Latitude: 51° 8' 26.4"
 - Longitude: 11° 58' 7.7"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #5: 
- Latitude: 51° 8' 26.4"
 - Longitude: 11° 58' 7.7"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #6: 
- Latitude: 51° 8' 26.4"
 - Longitude: 11° 58' 7.7"
 - Geodetic system: WGS84
 - Precise localization: no
 
Update for this sheet: 21 April 2024