[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Jürgenshagen
- Commissioning:

- 6 turbines: Bonus B62/1300 (power 1 300 kW, diameter 62 m)
- Hub height:

- Total nominal power: 7,800 kW
- Operational
- Onshore wind farm
- Developers: WPD/WIDEMAG/Wind Projekt
- Source:

- Source:

- Source:

Production forecast
- From Saturday, January 23 2021, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 4.1 %
- Expected production: 7,750 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Jürgenshagen
- Commissioning:

- 2 turbines: Bonus B76/2000 (power 2 000 kW, diameter 76 m)
- Hub height:

- Total nominal power: 4,000 kW
- Operational
- Onshore wind farm
- Developers: WPD/WIDEMAG/Wind Projekt
- Source:

- Source:

- Source:

Production forecast
- From Saturday, January 23 2021, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 4.1 %
- Expected production: 3,980 kWh
- Values from Weathernews Windcaster solution
Part #3:
- City: Jürgenshagen
- 2 turbines: Enercon E40/500 (power 500 kW, diameter 40 m)
- Total nominal power: 1,000 kW
- Operational
- Onshore wind farm
Part #4:
- City: Jürgenshagen
- Commissioning:

- 1 turbine: Enercon E70/2000 (power 2 000 kW, diameter 70 m)
- Hub height:

- Total nominal power: 2,000 kW
- Operational
- Onshore wind farm
Localisation
Part #1:
- Latitude: 53° 57' 59.9"
- Longitude: 11° 53' 45.2"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 53° 58' 11.3"
- Longitude: 11° 54' 5.3"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Latitude: 53° 58' 9.4"
- Longitude: 11° 52' 41.4"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #4:
- Latitude: 53° 58' 9.4"
- Longitude: 11° 52' 41.4"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 26 June 2020
Complete/correct this sheet: