Wind farms
Veer Dörper (Germany)| Veer Dörper (Germany) |
|
| Operational (99,95 MW) |

| Country | Germany |
| County/Zone | Schleswig-Holstein |
| City | Goldebek - Joldelund |
| Wind farm type | Onshore wind farm |

![]() | 8.2 MW commissioned |
![]() | 89.7 MW commissioned |
![]() | 2.05 MW commissioned |

| Developer | #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturers |
|

| Operational | Enercon E70/2300 (x 39) |
| Operational | Senvion MM82/2050 (x 5) |

| No source available |

| City | Joldelund |
| Commissioning | ![]() |
| Turbines | 39x Enercon E70/2300 (power 2,300 kW, diameter 71 m) |
| Hub height | ![]() |
| Total nominal power | 89,700 kW |
| Status | Operational |
| Coordinates | Latitude 54° 39' 12" - Longitude 9° 7' 31.9" |
| Precise localization | No |
| City | Goldebek |
| Commissioning | ![]() |
| Turbine | 1x Senvion MM82/2050 (power 2,050 kW, diameter 82 m) |
| Hub height | ![]() |
| Total nominal power | 2,050 kW |
| Status | Operational |
| Coordinates | Latitude 54° 41' 26.6" - Longitude 9° 9' 42.5" |
| Precise localization | No |
| City | Goldebek |
| Commissioning | ![]() |
| Turbines | 4x Senvion MM82/2050 (power 2,050 kW, diameter 82 m) |
| Hub height | ![]() |
| Total nominal power | 8,200 kW |
| Status | Operational |
| Coordinates | Latitude 54° 40' 54.9" - Longitude 9° 10' 6.1" |
| Precise localization | No |
Databases ![]() Germany (104.2 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Lindewitt (1 km) Sillerup (1 km) Blye (1 km) Sillerup Repowering (1 km) Reußenköge (1 km) Süderland (2 km) Rodautal (3 km) Linnau (3 km) Löwenstedt (4 km) Lindewitt-Linnau (4 km) | ||
|
Insights Production capacity Germany : 77,691.0 MW (end of 2025) Schleswig-Holstein : 10,437.0 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 12 September 2022 |
||