Part #1:
- City: Landscheide
- Commissioning:

- 4 turbines: Neg Micon NM64/1500 (power 1 500 kW, diameter 64 m)
- Total nominal power: 6,000 kW
- Operational
- Onshore wind farm
- Developer: WPD
- Source:

Production forecast
- From Saturday, May 28 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 91.4 %
- Expected production: 131,650 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Landscheide
- Commissioning:

- 6 turbines: Neg Micon NM64/1500 (power 1 500 kW, diameter 64 m)
- Total nominal power: 9,000 kW
- Operational
- Onshore wind farm
- Developer: GEWI
- Operator: GEWI
- Owner:

- Source:

Production forecast
- From Saturday, May 28 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 90.5 %
- Expected production: 195,570 kWh
- Values from Weathernews Windcaster solution
Part #3:
- City: Sankt Margarethen
- Commissioning:

- 3 turbines: Bonus B62/1300 (power 1 300 kW, diameter 62 m)
- Total nominal power: 3,900 kW
- Operational
- Onshore wind farm
Production forecast
- From Saturday, May 28 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 80.3 %
- Expected production: 75,190 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 53° 54' 35.9"
- Longitude: 9° 15' 35.9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 53° 55' 12.1"
- Longitude: 9° 15' 10.8"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Latitude: 53° 54' 4.4"
- Longitude: 9° 15' 43.5"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 12 May 2022
Complete/correct this sheet: