Wind farms
Nordhackstedt (Germany)| Nordhackstedt (Germany) |
|
| Operational (26,9 MW) |

| Country | Germany |
| County/Zone | Schleswig-Holstein |
| City | Nordhackstedt |
| Wind farm type | Onshore wind farm |

![]() | 0.6 MW commissioned |
![]() | 1.5 MW commissioned |
![]() | 2.05 MW commissioned |
![]() | 3.4 MW commissioned |
![]() | 9.15 MW commissioned |
![]() | 10.2 MW commissioned |

| Developers |
![]() #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturers |
|

| Operational | Senvion 3.4M114 (x 3) |
| Operational | Enercon E101/3050 (x 3) |
| Operational | Senvion MM92/2050 (x 1) |
| Operational | Senvion 3.4M104 (x 1) |
| Operational | Nordex S70 (x 1) |
| Operational | Tacke TW-600 (x 1) |

![]() | |

| City | Nordhackstedt |
| Commissioning | ![]() |
| Turbine | 1x Senvion MM92/2050 (power 2,050 kW, diameter 92.5 m) |
| Hub height | ![]() |
| Total nominal power | 2,050 kW |
| Status | Operational |
| Coordinates | Latitude 54° 44' 25.5" - Longitude 9° 11' 20.9" |
| Precise localization | Yes |
| City | Nordhackstedt |
| Commissioning | ![]() |
| Turbine | 1x Senvion 3.4M104 (power 3,400 kW, diameter 104 m) |
| Hub height | ![]() |
| Total nominal power | 3,400 kW |
| Status | Operational |
| Developer | ![]() |
| Coordinates | Latitude 54° 43' 59.1" - Longitude 9° 10' 1.4" |
| Precise localization | No |
| City | Nordhackstedt |
| Commissioning | ![]() |
| Turbines | 3x Senvion 3.4M114 (power 3,400 kW, diameter 114 m) |
| Hub height | ![]() |
| Total nominal power | 10,200 kW |
| Status | Operational |
| Coordinates | Latitude 54° 44' 27.5" - Longitude 9° 11' 12.9" |
| Precise localization | Yes |
| City | Nordhackstedt |
| Commissioning | ![]() |
| Turbines | 3x Enercon E101/3050 (power 3,050 kW, diameter 101 m) |
| Hub height | ![]() |
| Total nominal power | 9,150 kW |
| Status | Operational |
| Coordinates | Latitude 54° 43' 48" - Longitude 9° 8' 26.7" |
| Precise localization | No |
| City | Nordhackstedt |
| Commissioning | ![]() |
| Turbine | 1x Nordex S70 (power 1,500 kW, diameter 70 m) |
| Hub height | ![]() |
| Total nominal power | 1,500 kW |
| Status | Operational |
| Coordinates | Latitude 54° 44' 23.3" - Longitude 9° 11' 9.9" |
| Precise localization | No |
| City | Nordhackstedt |
| Commissioning | ![]() |
| Turbine | 1x Tacke TW-600 (power 600 kW, diameter 43 m) |
| Hub height | ![]() |
| Total nominal power | 600 kW |
| Status | Operational |
| Coordinates | Latitude 54° 44' 23.5" - Longitude 9° 10' 55.9" |
| Precise localization | No |
Databases ![]() Germany (104.2 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Meyn West (1 km) Hasselbek-Rodau (1 km) Rodautal (3 km) Hörup (4 km) Stoffeng (4 km) Linnau (4 km) Lindewitt (4 km) Lindewitt-Linnau (4 km) Großenwiehe (4 km) Süderland (4 km) | ||
|
Insights Production capacity Germany : 77,691.0 MW (end of 2025) Schleswig-Holstein : 10,437.0 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 17 October 2022 |
||