[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Welzow
- Commissioning:

- 4 turbines: Bonus B44/600 (power 600 kW, diameter 44 m)
- Hub height:

- Total nominal power: 2,400 kW
- Operational
- Onshore wind farm
- Developer: WPD
- Operator: Prometheus GmbH
- Source:

- Source:

Production forecast
- From Sunday, September 24 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 1.9 %
- Expected production: 1,090 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Welzow
- Commissioning:

- 3 turbines: Vestas V112/3300 (power 3 300 kW, diameter 112 m)
- Hub height:

- Total nominal power: 9,900 kW
- Operational
- Onshore wind farm
- Developer: UKA Group
- Owner:

- Source:

Production forecast
- From Sunday, September 24 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 3.1 %
- Expected production: 7,350 kWh
- Values from Weathernews Windcaster solution
Part #3:
- City: Welzow
- Commissioning:

- 1 turbine: Vestas V90/2000 (power 2 000 kW, diameter 90 m)
- Hub height:

- Total nominal power: 2,000 kW
- Operational
- Onshore wind farm
- Developer: UKA Group
- Source:

Production forecast
- From Sunday, September 24 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 11.5 %
- Expected production: 5,510 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 51° 32' 23.9"
- Longitude: 14° 10' 11.9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 51° 32' 39.6"
- Longitude: 14° 10' 2.3"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Latitude: 51° 32' 30"
- Longitude: 14° 10' 36"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 18 November 2022
Complete/correct this sheet: