Part #1: 
- City: Treuenbrietzen
 - Commissioning: 

 - 3 turbines: Nordex S77 (power 1 500 kW, diameter 77 m)
 - Hub height: 

 - Total nominal power: 4,500 kW
 - Operational
 - Onshore wind farm
 - Operator: Enertrag
 - Owner: 

 - Source: 

 
Part #2: 
- City: Treuenbrietzen
 - Commissioning: 

 - 2 turbines: Nordex S70 (power 1 500 kW, diameter 70 m)
 - Hub height: 

 - Total nominal power: 3,000 kW
 - Operational
 - Onshore wind farm
 - Operator: Enertrag
 - Owner: 

 - Source: 

 - Source: 

 
Part #3: 
- City: Nichel
 - Commissioning: 

 - 4 turbines: Enercon E138/4200 (power 4 200 kW, diameter 138.25 m)
 - Hub height: 

 - Total nominal power: 16,800 kW
 - Operational
 - Onshore wind farm
 
Part #4: 
- Part: Rietz
 - City: Treuenbrietzen
 - Commissioning: 

 - 4 turbines: GE Energy 2.75-120 (power 2 750 kW, diameter 120 m)
 - Hub height: 

 - Total nominal power: 11,000 kW
 - Operational
 - Onshore wind farm
 - Developer: Enertrag
 
Part #5: 
- Part: Rietz
 - City: Treuenbrietzen
 - Commissioning: 

 - 6 turbines: GE Energy 2.5-120 (power 2 500 kW, diameter 120 m)
 - Hub height: 

 - Total nominal power: 15,000 kW
 - Operational
 - Onshore wind farm
 - Developer: Enertrag
 
Localisation
Part #1: 
Part #2: 
Part #3: 
- Latitude: 52° 6' 4.2"
 - Longitude: 12° 48' 9.5"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #4: 
Part #5: 