[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Gerbstedt
- Commissioning:

- 9 turbines: Enron 1.5s (power 1 500 kW, diameter 70.5 m)
- Hub height:

- Total nominal power: 13,500 kW
- Dismantled (2021/02)
- Onshore wind farm
- Developer: WPD
- Source:

Part #2:
- City: Gerbstedt
- Commissioning:

- 19 turbines: Nordex N60/1300 (power 1 300 kW, diameter 60 m)
- Hub height:

- Total nominal power: 24,700 kW
- Operational
- Onshore wind farm
- Developers: Ostwind/Kloss New Energy
- Source:

- Source:

Production forecast
- From Saturday, June 10 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 7.9 %
- Expected production: 46,560 kWh
- Values from Weathernews Windcaster solution
Part #3:
Production forecast
- From Saturday, June 10 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 30.3 %
- Expected production: 10,900 kWh
- Values from Weathernews Windcaster solution
Part #4:
- City: Gerbstedt
- Commissioning:

- 3 turbines: GE Energy 1.5sl (power 1 500 kW, diameter 77 m)
- Hub height:

- Total nominal power: 4,500 kW
- Operational
- Onshore wind farm
- Developer: e.n.o. Energy
- Operator: e.n.o. Energy
Localisation
Part #1:
- Latitude: 51° 38' 42.4"
- Longitude: 11° 39' 25.7"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 51° 38' 42.4"
- Longitude: 11° 39' 25.7"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Latitude: 51° 38' 42.4"
- Longitude: 11° 39' 25.7"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #4:
- Latitude: 51° 38' 42.4"
- Longitude: 11° 39' 25.7"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 9 November 2022
Complete/correct this sheet: