Generalities
|
|
Details
- City: Perleberg
- Commissioning: 2002/12
- 1 turbine: Enercon E66/1800 (power 1 800 kW, diameter 66 m)
- Hub height: 65 m
- Total nominal power: 1,800 kW
- Operational
- Onshore wind farm
- Developer: PNE
- Operator: Futuren
Production forecast
- From Thursday, December 12 2019, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 9.1 %
- Expected production: 3,940 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 53° 4' 12"
- Longitude: 11° 51' 35.9"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 13 February 2018