Wind farms
Blumberg (Germany)| Blumberg (Germany) |
|
| Operational (26,4 MW) |

| Country | Germany |
| County/Zone | Brandenburg |
| City | Ahrensfelde - Werneuchen |
| Wind farm type | Onshore wind farm |

![]() | 6 MW commissioned |
![]() | 6 MW commissioned |
![]() | 3.6 MW commissioned |
![]() | 10.8 MW commissioned |

| Developer | #ND |
| Operators |
![]() ![]() |
| Owner | #ND |
| Manufacturer |
|

| Operational | Vestas V136/3450 (x 3) |
| Operational | Vestas V150/6.0MW (x 2) |
| Operational | Vestas V126/3450 (x 1) |

![]() | |

| City | Ahrensfelde |
| Commissioning | ![]() |
| Turbines | 3x Vestas V136/3450 (power 3,450 kW, diameter 136 m) |
| Hub height | ![]() |
| Total nominal power | 10,800 kW (uprated turbines) |
| Status | Operational |
| Operator | ND |
| Coordinates | Latitude 52° 35' 31.8" - Longitude 13° 39' 27.2" |
| Precise localization | No |
| City | Werneuchen |
| Commissioning | ![]() |
| Turbine | 1x Vestas V126/3450 (power 3,450 kW, diameter 126 m) |
| Hub height | ![]() |
| Total nominal power | 3,600 kW (uprated turbine) |
| Status | Operational |
| Operator | ND |
| Coordinates | Latitude 52° 35' 31.8" - Longitude 13° 39' 27.2" |
| Precise localization | No |
| City | Werneuchen |
| Commissioning | ![]() |
| Turbine | 1x Vestas V150/6.0MW (power 6,000 kW, diameter 150 m) |
| Hub height | ![]() |
| Total nominal power | 6,000 kW |
| Status | Operational |
| Operator | ND |
| Coordinates | Latitude 52° 35' 31.8" - Longitude 13° 39' 27.2" |
| Precise localization | No |
| City | Werneuchen |
| Commissioning | ![]() |
| Turbine | 1x Vestas V150/6.0MW (power 6,000 kW, diameter 150 m) |
| Hub height | ![]() |
| Total nominal power | 6,000 kW |
| Status | Operational |
| Operator | ND |
| Coordinates | Latitude 52° 35' 31.8" - Longitude 13° 39' 27.2" |
| Precise localization | No |
Databases ![]() Germany (104.2 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Blumberg (Berlin) (0 km) Seefeld (1 km) Seefeld-Krummensee (4 km) Krummensee IV (4 km) Trappenhof (5 km) Blumberg II (6 km) Birkholz IV (6 km) Beeskow-Hufenfeld-Birkholz (7 km) Birkholz (7 km) Wegendorf (8 km) | ||
|
Insights Production capacity Germany : 77,691.0 MW (end of 2025) Brandenburg : 10,012.1 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 9 February 2026 |
||