[Back to previous page]
Generalities
|
|
Details
- City: Rietz-Neuendorf
- Commissioning:
- 2 turbines: Nordex N149/4.0-4.5 (power 4 500 kW, diameter 149.1 m)
- Hub height:
- Total nominal power: 9,000 kW
- Operational
- Onshore wind farm
- Operator: Trianel GmbH
Localisation
- Latitude: 52° 14' 32.4"
- Longitude: 14° 14' 4.4"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 0
Complete/correct this sheet: