Generalities
|
|
Details
Part #1:
- City: Alpen
- Commissioning:

- 3 turbines: GE Energy 1.5sl (power 1 500 kW, diameter 77 m)
- Total nominal power: 4,500 kW
- Operational
- Onshore wind farm
Production forecast
- From Thursday, August 18 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 2.5 %
- Expected production: 2,660 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Alpen
- Commissioning:

- 3 turbines: Enercon E66/1800 (power 1 800 kW, diameter 66 m)
- Hub height:

- Total nominal power: 5,400 kW
- Operational
- Onshore wind farm
- Developer: SL Windenergie
- Operator: SL Windenergie
- Owner:

- Source:

Production forecast
- From Thursday, August 18 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 1.5 %
- Expected production: 2,000 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 51° 36' 33.5"
- Longitude: 6° 25' 9.7"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 51° 36' 15.2"
- Longitude: 6° 27' 46.8"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 13 July 2022
Complete/correct this sheet: