Generalities
|
|
Details
- City: Tejado
- Commissioning:

- 20 turbines: Suzlon S88/2100 (power 2 100 kW, diameter 88 m)
- Total nominal power: 42,000 kW
- Operational
- Onshore wind farm
- Developer: Peesa
- Operator: Peesa
Production forecast
- From Friday, December 8 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 85.6 %
- Expected production: 863,270 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 41° 33' 56.8"
- Longitude: -2° 17' 45.1"
- Geodetic system: WGS84
- Precise localization: no