Part #1: 
- City: Großrössen
 - Commissioning: 

 - 1 turbine: Dewind D4 (power 600 kW, diameter 48 m)
 - Hub height: 

 - Total nominal power: 600 kW
 - Operational
 - Onshore wind farm
 
Part #2: 
- City: Großrössen
 - Commissioning: 

 - 1 turbine: Dewind D6-1000 (power 1 000 kW, diameter 62 m)
 - Hub height: 

 - Total nominal power: 1,000 kW
 - Operational
 - Onshore wind farm
 
Part #3: 
- City: Falkenberg
 - Commissioning: 

 - 1 turbine: Enercon E115/3000 (power 3 000 kW, diameter 115.7 m)
 - Hub height: 

 - Total nominal power: 3,000 kW
 - Operational
 - Onshore wind farm
 
Part #4: 
- City: Beyern, Großrössen
 - Commissioning: 

 - 2 turbines: Enercon E138/3500 (power 3 500 kW, diameter 138 m)
 - Hub height: 

 - Total nominal power: 7,000 kW
 - Operational
 - Onshore wind farm
 
Part #5: 
- City: Großrössen
 - Commissioning: 

 - 1 turbine: Dewind D4 (power 600 kW, diameter 48 m)
 - Hub height: 

 - Total nominal power: 600 kW
 - Operational
 - Onshore wind farm
 
Part #6: 
- Part: Herzberg (Elster)
 - City: Elbe-Elster
 - Commissioning: 

 - 1 turbine: Enercon E115/4200 (power 4 200 kW, diameter 115.7 m)
 - Hub height: 

 - Total nominal power: 4,200 kW
 - Operational
 - Onshore wind farm
 
Localisation
Part #1: 
- Latitude: 51° 38' 12"
 - Longitude: 13° 14' 10.7"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #2: 
- Latitude: 51° 37' 54.7"
 - Longitude: 13° 12' 37.2"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #3: 
- Latitude: 51° 38' 6.6"
 - Longitude: 13° 12' 52.6"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #4: 
Part #5: 
- Latitude: 51° 38' 12"
 - Longitude: 13° 14' 10.7"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #6: 
- Part: Herzberg (Elster)
 - Latitude: 51° 38' 14.1"
 - Longitude: 13° 12' 22.2"
 - Geodetic system: WGS84
 - Precise localization: no
 