Part #1: 
- City: Hohenfelde
 - Commissioning: 

 - 1 turbine: Vensys 77 (power 1 500 kW, diameter 76.8 m)
 - Hub height: 

 - Total nominal power: 1,500 kW
 - Operational
 - Onshore wind farm
 
Part #2: 
- City: Dithmarschen
 - Commissioning: 

 - 1 turbine: Nordex N149/5.X (power 5 000 kW, diameter 149.1 m)
 - Hub height: 

 - Total nominal power: 5,700 kW (uprated turbine)
 - Operational
 - Onshore wind farm
 
Part #3: 
- City: Dithmarschen
 - Commissioning: 

 - 1 turbine: Nordex N133/4800 (power 4 800 kW, diameter 133.2 m)
 - Hub height: 

 - Total nominal power: 4,800 kW
 - Operational
 - Onshore wind farm
 
Part #4: 
- City: Dithmarschen
 - Commissioning: 

 - 1 turbine: Enercon E115/4200 (power 4 200 kW, diameter 115.7 m)
 - Hub height: 

 - Total nominal power: 4,200 kW
 - Operational
 - Onshore wind farm
 
Part #5: 
- City: Hemme
 - Commissioning: 

 - 1 turbine: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
 - Hub height: 

 - Total nominal power: 2,300 kW
 - Operational
 - Onshore wind farm
 
Part #6: 
- City: Hemme
 - Commissioning: 

 - 1 turbine: Enercon E70/2300 (power 2 300 kW, diameter 71 m)
 - Hub height: 

 - Total nominal power: 2,300 kW
 - Operational
 - Onshore wind farm
 - Operator: Vossweg Windkraft KG
 
Part #7: 
- City: Hemme
 - Commissioning: 

 - 4 turbines: Enercon E70/2300 (power 2 300 kW, diameter 71 m)
 - Hub height: 

 - Total nominal power: 9,200 kW
 - Operational
 - Onshore wind farm
 
Part #8: 
- City: Hemme
 - Commissioning: 

 - 1 turbine: Enercon E70/2000 (power 2 000 kW, diameter 70 m)
 - Hub height: 

 - Total nominal power: 2,000 kW
 - Operational
 - Onshore wind farm
 
Part #9: 
- City: Hemme
 - Commissioning: 

 - 1 turbine: Enercon E53/800 (power 800 kW, diameter 52.9 m)
 - Hub height: 

 - Total nominal power: 800 kW
 - Operational
 - Onshore wind farm
 
Part #10: 
- City: Hemme
 - Commissioning: 

 - 6 turbines: Senvion 3.4M104 (power 3 400 kW, diameter 104 m)
 - Hub height: 

 - Total nominal power: 20,400 kW
 - Operational
 - Onshore wind farm
 
Part #11: 
- City: Hemme
 - Commissioning: 

 - 2 turbines: Vestas V52/850 (power 850 kW, diameter 52 m)
 - Hub height: 

 - Total nominal power: 1,700 kW
 - Operational
 - Onshore wind farm
 
Part #12: 
- City: Hemme
 - Commissioning: 

 - 1 turbine: Enercon E82/2350 (power 2 350 kW, diameter 82 m)
 - Hub height: 

 - Total nominal power: 2,350 kW
 - Operational
 - Onshore wind farm
 
Part #13: 
- City: Hemme
 - Commissioning: 

 - 3 turbines: Enercon E82/2350 (power 2 350 kW, diameter 82 m)
 - Hub height: 

 - Total nominal power: 7,050 kW
 - Operational
 - Onshore wind farm
 
Part #14: 
- City: Hemme
 - Commissioning: 

 - 1 turbine: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
 - Hub height: 

 - Total nominal power: 2,300 kW
 - Operational
 - Onshore wind farm
 
Part #15: 
- City: Hemme
 - Commissioning: 

 - 1 turbine: Enercon E70/2300 (power 2 300 kW, diameter 71 m)
 - Hub height: 

 - Total nominal power: 2,300 kW
 - Operational
 - Onshore wind farm
 
Part #16: 
- City: Hemme
 - Commissioning: 

 - 1 turbine: Enercon E70/2300 (power 2 300 kW, diameter 71 m)
 - Hub height: 

 - Total nominal power: 2,300 kW
 - Operational
 - Onshore wind farm
 
Part #17: 
Part #18: 
- City: Hemme
 - Commissioning: 

 - 1 turbine: Repower MM82 (power 2 000 kW, diameter 82 m)
 - Hub height: 

 - Total nominal power: 2,000 kW
 - Operational
 - Onshore wind farm
 
Localisation
Part #1: 
- Latitude: 53° 51' 7"
 - Longitude: 9° 33' 58"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #2: 
Part #3: 
Part #4: 
- Latitude: 54° 17' 23.1"
 - Longitude: 9° 0' 10.1"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #5: 
- Latitude: 54° 15' 16.4"
 - Longitude: 9° 0' 50.6"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #6: 
- Latitude: 54° 16' 32"
 - Longitude: 9° 1' 46.3"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #7: 
- Latitude: 54° 16' 18"
 - Longitude: 9° 1' 3.7"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #8: 
- Latitude: 54° 17' 8.9"
 - Longitude: 9° 0' 12.2"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #9: 
- Latitude: 54° 16' 6.2"
 - Longitude: 8° 56' 57.9"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #10: 
Part #11: 
- Latitude: 54° 16' 15.9"
 - Longitude: 9° 0' 49.1"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #12: 
Part #13: 
Part #14: 
Part #15: 
Part #16: 
Part #17: 
- Latitude: 54° 16' 35.1"
 - Longitude: 9° 0' 34.5"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #18: 
Update for this sheet: 0  
Complete/correct this sheet: