[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Heringsdorf
- Commissioning:

- 2 turbines: (manufacturer name not available)
- Total nominal power: 12,000 kW
- Operational
- Onshore wind farm
Part #2:
- City: Heringsdorf
- Commissioning:

- 3 turbines: (manufacturer name not available)
- Total nominal power: 18,600 kW
- Operational
- Onshore wind farm
Localisation
Part #1:
- Latitude: 54° 16' 57.8"
- Longitude: 11° 1' 42.3"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 54° 16' 57.8"
- Longitude: 11° 1' 42.3"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 0
Complete/correct this sheet: