Wind farms
Juprelle-Bassenge (Belgium)| Juprelle-Bassenge (Belgium) |
|
| Operational (17,25 MW) |

| Country | Belgium |
| County/Zone | Liège (Wallonie) |
| City | Bassenge - Juprelle |
| Wind farm type | Onshore wind farm |

![]() | 13.8 MW commissioned |
![]() | 3.45 MW commissioned |

| Developers |
![]() #ND |
| Operator | #ND |
| Owners |
![]() ![]() ![]() ![]() |
| Manufacturer |
|

| Operational | Vestas V117/3450 (x 5) |

![]() | |
![]() | |

| Part | Part 1 |
| City | Juprelle, Bassenge |
| Commissioning | ![]() |
| Turbines | 4x Vestas V117/3450 (power 3,450 kW, diameter 117 m) |
| Total nominal power | 13,800 kW |
| Status | Operational |
| Developer | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 50° 44' 27.3" - Longitude 5° 30' 59.3" |
| Precise localization | Yes |
| Part | Part 2 |
| City | Juprelle, Bassenge |
| Commissioning | ![]() |
| Turbine | 1x Vestas V117/3450 (power 3,450 kW, diameter 117 m) |
| Total nominal power | 3,450 kW |
| Status | Operational |
| Owners | ND/ /![]() |
| Coordinates | Latitude 50° 44' 23.9" - Longitude 5° 31' 25.9" |
| Precise localization | Yes |
Databases ![]() Belgium (9.0 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Tongeren-Vreren (2 km) Tongeren-Oost (5 km) Wonck (7 km) Hauts-Sarts (7 km) Riemst-Membruggen (8 km) Bassenge (8 km) Bilzen-Kieleberg (15 km) Bilzen E313 (17 km) Celanese (18 km) Bilzen (19 km) | ||
|
Insights Production capacity Belgium : 5,860.0 MW (end of 2025) Liège (Wallonie) : 366.6 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 11 June 2026 |
||