[Back to previous page]
Generalities
|
|
Details
Part #1:
- Part: Part 10
- City: Santa Luzia
- Commissioning:

- Turbine(s): (manufacturer name not available)
- Total nominal power: 34,800 kW
- Operational
- Onshore wind farm
- Operator: PEC Energia
- Owner:

- Source:

Part #2:
- Part: Part 11
- City: Santa Luzia
- Commissioning:

- Turbine(s): (manufacturer name not available)
- Total nominal power: 46,400 kW
- Operational
- Onshore wind farm
- Operator: PEC Energia
- Owners:
/
- Source:

Part #3:
- Part: Part 12
- City: Santa Luzia
- Commissioning:

- Turbine(s): (manufacturer name not available)
- Total nominal power: 40,600 kW
- Operational
- Onshore wind farm
- Operator: PEC Energia
- Owners:
/
- Source:

Part #4:
- Part: Part 16
- City: Santa Luzia
- Commissioning:

- Turbine(s): (manufacturer name not available)
- Total nominal power: 46,400 kW
- Operational
- Onshore wind farm
- Operator: PEC Energia
- Owner:

- Source:

Part #5:
- Part: Part 17
- City: Passagem
- Commissioning:

- Turbine(s): (manufacturer name not available)
- Total nominal power: 34,800 kW
- Operational
- Onshore wind farm
- Operator: PEC Energia
- Owner:

- Source:

Part #6:
- Part: Part 2
- City: Junco do Seridó
- Commissioning:

- Turbine(s): (manufacturer name not available)
- Total nominal power: 16,500 kW
- Operational
- Onshore wind farm
- Operator: EDF renewables
- Owner:

Part #7:
- Part: Part 3
- City: Junco do Seridó
- Commissioning:

- Turbine(s): (manufacturer name not available)
- Total nominal power: 44,000 kW
- Operational
- Onshore wind farm
- Operator: EDF renewables
- Owner:

Part #8:
- Part: Part 4
- City: Junco do Seridó
- Commissioning:

- Turbine(s): (manufacturer name not available)
- Total nominal power: 44,000 kW
- Operational
- Onshore wind farm
- Operator: EDF renewables
- Owner:

Part #9:
- Part: Part 6
- City: Junco do Seridó
- Commissioning:

- Turbine(s): (manufacturer name not available)
- Total nominal power: 44,000 kW
- Operational
- Onshore wind farm
- Operator: EDF renewables
- Owner:

Part #10:
- Part: Part 7
- City: Junco do Seridó
- Commissioning:

- Turbine(s): (manufacturer name not available)
- Total nominal power: 44,000 kW
- Operational
- Onshore wind farm
- Operator: EDF renewables
- Owner:

Part #11:
- Part: Part 9
- City: Junco do Seridó
- Commissioning:

- Turbine(s): (manufacturer name not available)
- Total nominal power: 49,500 kW
- Operational
- Onshore wind farm
- Operator: EDF renewables
- Owner:

Localisation
Part #1:
- Part: Part 10
- Latitude: -7° 14' 34.8"
- Longitude: -36° 49' 30"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
Part #3:
- Part: Part 12
- Latitude: -7° 14' 35"
- Longitude: -36° 49' 28.9"
- Geodetic system: WGS84
- Precise localization: no
Part #4:
- Part: Part 16
- Latitude: -7° 20' 49.2"
- Longitude: -36° 47' 42"
- Geodetic system: WGS84
- Precise localization: no
Part #5:
- Part: Part 17
- Latitude: -7° 16' 4.7"
- Longitude: -36° 44' 34.8"
- Geodetic system: WGS84
- Precise localization: no
Part #6:
- Part: Part 2
- Latitude: -6° 58' 1.1"
- Longitude: -36° 45' 32.4"
- Geodetic system: WGS84
- Precise localization: no
Part #7:
Part #8:
Part #9:
Part #10:
- Part: Part 7
- Latitude: -6° 58' 15.6"
- Longitude: -36° 44' 45.6"
- Geodetic system: WGS84
- Precise localization: no
Part #11:
Update for this sheet: 28 April 2025
Complete/correct this sheet: