[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Lüchow
- Commissioning:

- 3 turbines: (manufacturer name not available)
- Total nominal power: 19,800 kW
- Operational
- Onshore wind farm
Part #2:
- City: Wustrow
- Commissioning:

- 3 turbines: (manufacturer name not available)
- Total nominal power: 19,800 kW
- Operational
- Onshore wind farm
Localisation
Part #1:
- Latitude: 52° 56' 30.8"
- Longitude: 11° 7' 23.8"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 52° 56' 30.8"
- Longitude: 11° 7' 23.8"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 10 June 2025
Complete/correct this sheet: