Wind farms
Lippetal Rassenhövel (WEA 3) (Germany)| Lippetal Rassenhövel (WEA 3) (Germany) |
|
| Operational (4,26 MW) |

| Country | Germany |
| County/Zone | Nordrhein-Westfalen |
| City | Lippetal |
| Wind farm type | Onshore wind farm |

![]() | 4.26 MW commissioned |

| Developer | #ND |
| Operator |
![]() |
| Owner | #ND |
| Manufacturer | #ND |

| Operational | #ND (x 1) |

| No source available |

| Coordinates | Latitude 51° 40' 7" - Longitude 7° 59' 45.9" |
| Precise localization | No |
Databases ![]() Germany (104.2 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Lippetal-Nordwald (WEA 1) (0 km) Lippetal-Herzfeld (WEA 2) (0 km) Dinker Berg (2 km) Ebbeckewind (3 km) Beckum (6 km) Welver-Flerke (6 km) Welver (6 km) Dolberg (7 km) Lippborg (7 km) Elker (8 km) | ||
|
Insights Production capacity Germany : 77,691.0 MW (end of 2025) Nordrhein-Westfalen : 9,671.3 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 16 June 2025 |
||