[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Nordwestuckermark
- Commissioning:

- 3 turbines: (manufacturer name not available)
- Total nominal power: 17,100 kW
- Operational
- Onshore wind farm
Part #2:
- City: Nordwestuckermark
- Commissioning:

- 1 turbine: (manufacturer name not available)
- Total nominal power: 6,800 kW
- Operational
- Onshore wind farm
Localisation
Part #1:
- Latitude: 53° 19' 1.6"
- Longitude: 13° 31' 21.2"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 53° 19' 1.6"
- Longitude: 13° 31' 21.2"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 16 June 2025
Complete/correct this sheet: