[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Käbschütztal
- Commissioning:

- 1 turbine: (manufacturer name not available)
- Total nominal power: 5,560 kW
- Operational
- Onshore wind farm
Part #2:
- City: Nossen
- Commissioning:

- 1 turbine: (manufacturer name not available)
- Total nominal power: 5,560 kW
- Operational
- Onshore wind farm
Localisation
Part #1:
- Latitude: 51° 8' 35.5"
- Longitude: 13° 20' 56.5"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 51° 5' 58.6"
- Longitude: 13° 14' 9.4"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 8 December 2025
Complete/correct this sheet: