[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Hellenthal
- Commissioning:

- 1 turbine: Wind World W4100 (power 500 kW, diameter 40.1 m)
- Hub height:

- Total nominal power: 500 kW
- Operational
- Onshore wind farm
Part #2:
- City: Hellenthal
- 2 turbines: Seewind S 20 110 (power 110 kW, diameter 22 m)
- Total nominal power: 220 kW
- Dismantled (2005)
- Onshore wind farm
Localisation
Part #1:
Part #2:
- Latitude: 50° 25' 17.7"
- Longitude: 6° 25' 58.7"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 5 January 2026
Complete/correct this sheet: